Sarah & Mark Brown
Develop phase Working DrawingsNext Meeting
Your most important preparation focus.
Design Development Meeting
Meeting readiness
My Next 3 Things
Your most important actions for this project.
- 1.
Review island bench layout and seating requirements
Due Today·30m - 2.
Prepare updated design discussion for Sarah & Mark
Due Tue 27 Oct·45m - 3.
Review new kitchen ideas before the meeting
Due Wed 28 Oct·20m
Homeowner Focus Areas
Sarah & Mark's contributions, questions and inspiration.
Design Development
Progress the home design with Sarah & Mark.
Working Drawing v2 — Floorplan
Earlier concepts
- Concept Floorplan v1Mon 13 Oct
- Initial SketchWed 8 Oct
Homeowner design direction
Single-storey 33sq, 4 bed + study, island kitchen with walk-in pantry, north-facing alfresco.
Design questions to discuss
- Confirm island length supports 4 stools without crowding dining circulation.
- Confirm butler's pantry footprint against island and dining.
- Confirm slab design implications once revised engineering is received.
Where We're Heading
Shared project direction, consistent with the homeowner view.
- Home design
Single-storey, 33sq, 4 bed + study, island kitchen, walk-in pantry, north-facing alfresco.
- Living priorities
Open-plan living, family meals at the island, a separate study for working from home.
- Façade direction
Modern coastal — render with a timber feature, neutral palette.
- Investment direction
~$565k indicative, targeting contract late November.
Andrew: direction is firming around the walk-in pantry + island seating. Confirm slab/engineering doesn't change the footprint before locking the layout.
- Family time and indoor/outdoor living matter most
- Kitchen is the heart of the home — protect it
- Protect overall floor area and outdoor living
- Prefer single storey for long-term accessibility
- Confirm easement with a surveyor
- Share site cost guidance for Berwick
- Send Indicative Estimate summary (done)
- Easement status on the property
- Finance pre-approval
- Slab / engineering implications for the footprint
- Confirm finance pre-approval (Sarah & Mark)
Prototype information — static example content from Sarah & Mark’s Consultation.
Project Coordination
Jess owns delivery; you own your Advisor work.
Engineering revisions
Jess coordinatingCoordinating with Tom — revised scope expected Friday.
Working drawings
Jess coordinatingAwaiting revised engineering before SJD can finalise the slab design.
Slab design implications
Needs youConfirm slab design implications before the meeting so the layout can be locked.
Jess coordinates overall delivery. Andrew owns his assigned Advisor preparation and design work.
Recent Activity
Project updates — not a messaging feed.
Sarah added a question to Kitchen — Island Bench
Today, 1:05pm
Mark uploaded 'Love this island look' inspiration
Today, 11:20am
Jess updated Engineering coordination notes
Yesterday
Andrew flagged 'Pot drawers instead of corner cupboard' for next meeting
Yesterday
Andrew recorded a meeting outcome on 'Walk-in pantry instead of deep cupboards'
Mon 21 Oct