Develop phase Working Drawings
Beaconsfield VIC Advisor: Andrew Coordinator: Jess Target contract: Mon 24 Nov
Explore
Prepare
Consult
Develop
Working Drawings
Contract
Build
Handover

Next Meeting

Your most important preparation focus.

Design Development Meeting

Wednesday 28 October 2:00pm – 3:30pm At Display Home
ASAndrewSaSarah & MarkJSJess

Meeting readiness

5Homeowner contributions flagged for discussion
3New homeowner activity to review
2Advisor preparation items outstanding
4Items Jess is coordinating

My Next 3 Things

Your most important actions for this project.

  • 1.

    Review island bench layout and seating requirements

    Due Today·30m
  • 2.

    Prepare updated design discussion for Sarah & Mark

    Due Tue 27 Oct·45m
  • 3.

    Review new kitchen ideas before the meeting

    Due Wed 28 Oct·20m

Homeowner Focus Areas

Sarah & Mark's contributions, questions and inspiration.

Design Development

Progress the home design with Sarah & Mark.

Working Drawing v2 — Floorplan

Updated Tue 21 Oct, by SJD Drafting

Earlier concepts

  • Concept Floorplan v1Mon 13 Oct
  • Initial SketchWed 8 Oct

Homeowner design direction

Single-storey 33sq, 4 bed + study, island kitchen with walk-in pantry, north-facing alfresco.

Design questions to discuss

  • Confirm island length supports 4 stools without crowding dining circulation.
  • Confirm butler's pantry footprint against island and dining.
  • Confirm slab design implications once revised engineering is received.

Where We're Heading

Shared project direction, consistent with the homeowner view.

  • Home design

    Single-storey, 33sq, 4 bed + study, island kitchen, walk-in pantry, north-facing alfresco.

  • Living priorities

    Open-plan living, family meals at the island, a separate study for working from home.

  • Façade direction

    Modern coastal — render with a timber feature, neutral palette.

  • Investment direction

    ~$565k indicative, targeting contract late November.

Team working note

Andrew: direction is firming around the walk-in pantry + island seating. Confirm slab/engineering doesn't change the footprint before locking the layout.

What Matters Most
  • Family time and indoor/outdoor living matter most
  • Kitchen is the heart of the home — protect it
  • Protect overall floor area and outdoor living
  • Prefer single storey for long-term accessibility
Our Commitments
  • Confirm easement with a surveyor
  • Share site cost guidance for Berwick
  • Send Indicative Estimate summary (done)
Still to Clarify
  • Easement status on the property
  • Finance pre-approval
  • Slab / engineering implications for the footprint
Homeowner Next Steps
  • Confirm finance pre-approval (Sarah & Mark)

Prototype information — static example content from Sarah & Mark’s Consultation.

Project Coordination

Jess owns delivery; you own your Advisor work.

  • Engineering revisions

    Jess coordinating

    Coordinating with Tom — revised scope expected Friday.

  • Working drawings

    Jess coordinating

    Awaiting revised engineering before SJD can finalise the slab design.

  • Slab design implications

    Needs you

    Confirm slab design implications before the meeting so the layout can be locked.

Jess coordinates overall delivery. Andrew owns his assigned Advisor preparation and design work.

Recent Activity

Project updates — not a messaging feed.

  • Sarah added a question to Kitchen — Island Bench

    Today, 1:05pm

  • Mark uploaded 'Love this island look' inspiration

    Today, 11:20am

  • Jess updated Engineering coordination notes

    Yesterday

  • Andrew flagged 'Pot drawers instead of corner cupboard' for next meeting

    Yesterday

  • Andrew recorded a meeting outcome on 'Walk-in pantry instead of deep cupboards'

    Mon 21 Oct